The EtherCAT Technology Group (ETG) has published version 1.0 of the ETG.1800 EtherCAT Security Profile in November 2026, providing machine builders and device manufacturers with a formal specification for meeting IEC 62443-3-3 Security Level 2 (SL 2) requirements without modifying the underlying EtherCAT protocol or replacing field hardware.
The release follows UL Solutions' assessment and certification of EtherCAT technology in early 2026 and arrives roughly one year before the main cybersecurity requirements and CE marking obligations of the EU Cyber Resilience Act (CRA) take effect on December 11, 2027.
Why fieldbus cybersecurity is a hard problem under CRA
Under both IEC 62443 and the EU CRA, manufacturers of connected machinery and industrial components must perform a formal risk assessment and demonstrate proportionate technical protection. For conventional industrial Ethernet and fieldbus systems, meeting those expectations has typically forced an awkward trade-off:
- Either treat the entire machine network as a physically locked "secure zone" — difficult when servo drives, remote I/O and sensors are distributed across a large machine frame with accessible cabling — or
- Add cryptographic security extensions into new device hardware, which often introduces cyclic latency, heavier configuration workflows and forced hardware replacement across existing machine designs.
Three blueprint threat scenarios in ETG.1800
Recognizing that threat levels vary by installation, ETG.1800 structures risk assessment around three standardized blueprint scenarios that OEMs and plant operators can use as templates for machine-specific risk evaluations:
| Blueprint Scenario | Assumed Environment & Threat Model | Target Security Level | Required Changes to Existing EtherCAT Devices |
|---|---|---|---|
| Scenario 1 (Available now in v1.0) | Non-public production hall; intentional attacker with simple means and generic skills | IEC 62443-3-3 SL 2 | None — fulfilled by 25 existing EtherCAT functions (configuration adjustments where needed) |
| Scenario 2 (In development) | Elevated attacker capability with moderate resources and IACS-specific skills | IEC 62443-3-3 SL 3 | Software extensions in MainDevice and configuration tool only; no SubDevice changes |
| Scenario 3 (In development) | High-assurance environments requiring data confidentiality in addition to integrity | SL 3 + Confidentiality | Software support for device authentication and encryption in MainDevice and SubDevices; no ESC silicon changes |
How existing EtherCAT hardware achieves SL 2
Unlike industrial protocols that process frames through a general-purpose TCP/IP software stack on every node, EtherCAT processes frames on the fly in dedicated hardware (EtherCAT SubDevice Controllers, or ESCs) within a closed cyclic loop controlled by a single MainDevice. As discussed in our comparison of PROFINET, EtherNet/IP and EtherCAT, that hardware-driven architecture already minimizes the attack surface on field nodes.
In ETG.1800 v1.0, the specification documents 25 existing EtherCAT system functions — already defined in core EtherCAT standards — that collectively address the applicable IEC 62443-3-3 system requirements for Blueprint Scenario 1. According to Dr. Guido Beckmann, Chair of the ETG Technical Committee, a large share of typical factory installations map cleanly onto Scenario 1 and can achieve conformity without hardware redesign, relying instead on documented configuration hardening and risk-assessment mapping.
Roadmap for Scenario 2 and Scenario 3
For machines operating in higher-risk environments — such as critical infrastructure, exposed outdoor equipment or multi-tenant facilities — ETG confirmed a staged roadmap:
- Scenario 2 (SL 3): Software-based security extensions implemented in the EtherCAT MainDevice and engineering configuration tools, leaving installed SubDevices unchanged.
- Scenario 3 (SL 3 plus confidentiality): Protocol extensions adding explicit device authentication and payload encryption in MainDevice and SubDevice firmware, while preserving compatibility with existing EtherCAT SubDevice Controller hardware.
Practical takeaways for OEMs and integrators
Machine builders preparing simultaneously for the January 20, 2027 EU Machinery Regulation (EU) 2023/1230 (which mandates protection against corruption of safety-related control systems) and the December 11, 2027 CRA deadline should take three immediate steps:
- Map each machine family to ETG.1800's blueprint scenarios during your IEC 62443-3-2 risk assessment rather than assuming every internal motion bus requires full link encryption.
- Audit MainDevice configuration settings — unused Ethernet ports, diagnostic interfaces, mailbox routing and remote engineering paths on the PLC or IPC remain the primary entry points into an EtherCAT segment.
- Document the security boundary explicitly in machine technical files so notified bodies and end-user security teams can trace how fieldbus controls satisfy both Machinery Regulation and CRA obligations.